Draft for review. All copy, projects and contact details are sample content.
Kinematics.

All projects

Keeping 400 students comfortable through a full school day

A new two-storey STEM building with labs, workshops and a makerspace, designed to stay comfortable in a Melbourne summer without oversized plant.

Client
[Client]
Location
[Suburb], VIC
Sector
Education
Our scope
Mechanical, hydraulics
Completed
[Year]
Placeholder services drawing for the STEM building

The problem

Science labs need high fresh-air rates and fume extraction, which usually means big plant and big running costs. The school's budget and roof space allowed for neither.

What we did

We split the building into zones by how each room is actually used, so labs get extra ventilation only when they're occupied. Heat recovery on the exhaust pre-conditions incoming air, and the hydraulic design keeps lab waste separate from general drainage.

The result

The building runs on smaller plant than first proposed and holds comfortable temperatures through the hottest weeks of term.

[x]%smaller plant than the concept design
[x] kWcooling capacity installed
[x]weeks from brief to permit drawings

Project team

Architect [name]. Builder [name]. Structural [name].

Got a project coming up?

Send us the drawings and a rough program. We'll tell you what the services need and what it'll take.